Hi all,
We ended up not being able to perform an in place upgrade on our LDMS 9 core server, so we opted for a side by side upgrade. Everything is pretty much done, and one of the last things to do is populate the scheduled task and distribution packages on the 9.5 core. I imagined that performing a ldms export of te pacckages and task from 9, and importing them in to 9.5 would've done the trick; however it seems that this is not as simple as I imagined due to the versions mismatch.
Is it possible to export/import distribution packages and scheduled task from LDMS 9 to LDMS 9.5?